| OE Pillar | WMS Contribution | |-----------|------------------| | HSE | PTW, risk assessment, SIMOPS, LOTO | | Asset Management | Preventive & predictive maintenance planning | | Continuous Improvement | Work feedback loop and KPI monitoring | | Competency | Role-based WMS training and assurance |
| Priority | Definition | Planning Window | Execution Window | |----------|------------|----------------|------------------| | P0 (Emergency) | Imminent HSE or major production loss | 0 hr | Immediate | | P1 (Urgent) | Significant degradation | 4-8 hrs | 24 hrs | | P2 (Planned) | Routine corrective/preventive | 2 weeks | 4 weeks | | P3 (Deferrable) | Minor improvement / low risk | Next shutdown | Next opportunity | work management system -wms- adnoc pdf
- Permit to Work (PTW) process (cold, hot, confined space) - Isolation management (LOTO – Lock Out Tag Out) - Real-time progress tracking Process deviations - Priority classification (Emergency
**4.1 Work Identification** - Sources: Inspections, Operator rounds, Condition monitoring, Process deviations - Priority classification (Emergency, Urgent, Routine, Planned) - Task list creation - Resource estimation (Manpower, tools, materials) - Risk assessment (HAZID, JSA) materials) - Risk assessment (HAZID
2.1 Lifecycle Asset Management 2.2 HSE First: Permit to Work (PTW) Integration 2.3 Reliability Centered Maintenance (RCM) 2.4 Competency Assurance
The ADNOC Work Management System (WMS) provides a standardized framework for the safe, efficient, and reliable execution of all maintenance and operational work across ADNOC Group’s assets. It integrates with the ADNOC Operational Excellence (OE) System and enforces rigorous Permit to Work (PTW) protocols to ensure zero harm, maximum asset integrity, and optimized lifecycle cost.